A gulf coast chemical plant wanted to keep its process water flowing during a large clarifier rebuild that was scheduled to take place over several months. The site needed 3,000 gallons per minute of river water clarified and filtered to <2 NTU to replicate the permanent clarifier’s performance. With our extensive fleet of rental clarifiers available, they called upon Monroe Environmental.
Monroe provided (4) X-Flo Mobile Clarifiers™ to get the job done. The systems were installed and operated successfully around the clock (24/7) while the permanent clarifier was rebuilt. The rental clarifiers helped to supply clean, clarified water to the plant’s processes during the prolonged maintenance event.