Clean Air & Clean Water Solutions for Your Plant

William H. Boyle, P.E.

|William H. Boyle, P.E.

About William H. Boyle, P.E.

This author has not yet filled in any details.
So far William H. Boyle, P.E. has created 2 blog entries.

Design Considerations for Basin Collection Troughs in Water or Wastewater Treatment Plants

2019-02-20T08:40:12+00:00

Design of the various collection troughs have a direct bearing on both the process and the economic aspects of the water or wastewater treatment facility.

Design Considerations for Basin Collection Troughs in Water or Wastewater Treatment Plants2019-02-20T08:40:12+00:00

Importance of Side Water Depth in Planning and Evaluating Clarification Equipment

2019-01-15T10:15:27+00:00

Side Water Depth (SWD) is critical when the design engineer is planning new clarification equipment or evaluating existing units. The application of the clarifier/settling tank has a lot to do with the selection of the side water depth.

Importance of Side Water Depth in Planning and Evaluating Clarification Equipment2019-01-15T10:15:27+00:00