Water | Circular Clarifier for Steel Mill Upgrade
Monroe Environmental2019-05-07T10:45:59-04:00Monroe Environmental saves steel mill $145,000 on clarifier rebuild/retrofit for blast furnace wastewater and meets stringent performance requirements.
Monroe Environmental saves steel mill $145,000 on clarifier rebuild/retrofit for blast furnace wastewater and meets stringent performance requirements.
A steel fabrication facility used a sandblast material that would pulverize upon contact with the metal surface and create thousands of fine dust particles that would cloudy the air and fill their paint shop bay. Monroe designed and installed a 6,000 CFM Cartridge Dust Collector to capture the exhaust and filter smoke, fumes, and dust.
Monroe engineered & oversaw the redesign, retrofit, & installation of a multi-million dollar steel coil cleaning line upgrade at a galvanizing plant.