Clarifier Rebuilds / Retrofits

If you plan to rebuild or retrofit a water or wastewater treatment clarifier, call Monroe Environmental. We specialize in the repair, retrofit, replacement and general upgrading of clarifiers. We recognize that up-time is critical; we've replaced whole systems in as little as 3 days - from empty tank to new internals installed and operating.

Rebuilding and replacing the internals of a concrete or steel tank clarifier is a quick, cost-effective solution versus constructing an entirely new system. The clarifier tanks often maintain a suitable operating condition while the skimmer arm, center well, drive assembly, and sludge rakes corrode and wear beyond an acceptable level.

The benefits of a Monroe Environmental Clarifier Rebuild are straightforward and simple:

  • Faster installations & reduced total cost
  • Minimal clarifier downtime

These benefits are realized because we are able to fully assemble clarifier equipment in our shop. We inspect and test every bolt, weld, and panel to make sure that each component fits together perfectly before it is shipped to site and installed. This key step can be the difference between a few days of simple installation or weeks of fitting, engineering, and re-working equipment in the field. By reducing installation time, projects can often be completed ahead of schedule with minimal labor cost.

Call or This e-mail address is being protected from spambots. You need JavaScript enabled to view it us and a Sales Engineer will contact you to review the details.

secondary circular clarifier clarifier rake assembly
clarifier installation clarifier drive installation
clarifier installation clarifier influent well installation
secondary clarifier tank secondary clarifier in operation

 


 

pdficon Clarifier Rebuilds.pdf (592k)

pdficon Water and Wastewater Treatment.pdf (2.7Mb)

 

Our Products

Air Case Study

Monroe Environmental was called upon to purify a 20,000 CFM exhaust stream ...Read more »

Water Case Study

A municipal WWTP found that (2) of their secondary clarifiers were too rusted and corroded to properly function...Read more »

News Releases

All Press Releases
Detroit Wastewater Treatment Plant Renovation
Monroe Sales Executive Award Nomination
U.S. Congressman John Dingell Visits Monroe Environmental
Monroe Environmental Establishing New Markets